The Calar Alto Computer News for 2000
(Period from January to June 2000)
(A) Hardware:
- The Calar Alto Network has been inproved with the addition of 3 Giga Switches. Now 2.2, 3.5 and Laboratory are connected with a 1 Gb. bandwidth. 1.23 is connected with a bandwidth of 100.
- Laboratory has now a more distributed network as we have used the old 100 Mb. switches. Now the net is split into several pieces allowing more bandwidth for end users
- Jobs for allowing about 10 modems for remote PPP connections has been started. This will allow in a near future people from their rooms to connect to the network
(B) Software:
- New version of IRAF for solving problems with the Y2K effect. Now the Bug Free version working at Calar Alto is v.2.11.3
- StarOffice 5.1 suite installed for general use on the network
- Secure Shell (ssh) installed (Ralph Tremmel)
- Accounts obs1a, obs1b, obs2a, obs2b, obs3a and obs3b have been unified, protecting configuration files.
- A new Data Base for the Night Reports has been built on the system. Now all night reports are being stored and can be consulted any time.
- Meteorological data has been inserted on the Epics1. This is not totally finished, but in a near future, all weather data can be included on the Fits header
- NTP (Network Time Protocol) has been installed on all instrumentation machines (ultra1, ultra2 and ultra3) so now all three are syncronized with an NTP server.
- ds9 installed It is Saotng 1.9.3 with a nice TCL/TK GUI.
(C) Personnel:
- We have a new coleage on the Computer group. Ricardo Hernández started up on the 29th of May and will cover the area of Instrumentation Software
CAHA COMPUTER GROUP (June 2000)
Ernst Schachtebeck (+34 950 632 505)
Ricardo Hernández (+34 950 632 533)
Enrique de Guindos (+34 950 632 517)